Installation and commissioning of air compressors
Release time:
2018-06-26
The air compressor is bought well, and inaccurate commissioning is a waste of air compressor performance resources. Today I will analyze the installation and commissioning process of air compressor.
The air compressor is bought well, and inaccurate commissioning is a waste of air compressor performance resources. Today I will analyze the installation and commissioning process of air compressor.
I. Installation of air compressor
Air compressor installation needs to choose a good equipment installation location according to the user's site use, build a suitable air compressor room, protect the neatness of the air compressor ventilation environment and be able to operate normally, then install the air compressor, install the air compressor according to the customer's needs, and connect the whole process down, using energy-saving air piping. Add cables and reinforce the stability of the equipment.
Second, the commissioning sequence of air compressor
Unload operation and air compressor loading operation according to the power exhaust volume in line with the customer's air consumption.
To ensure the normal operation of these points of the air compressor, the general frequency pressure mediation is 0.6-0.8Mpa, the loading pressure of the permanent magnet inverter air compressor is 0.6MPa, the loading pressure is 0.8Map, and the constant pressure is at 0.7Mpa; the above is the conventional setting, and the specific or according to the needs of the user to develop the gas program.
Observation of air compressor operation
After the commissioning is completed, observe whether there are any abnormalities in the operation of the compressor and solve them on site. Generally, there is no problem, after all, it is a new machine. Observe whether there is any abnormal noise in the operation of the main machine and motor, and observe the tension if the belt, which can be adjusted; observe whether the frequency conversion data of the inverter air compressor is normal, and whether the terminals are tightened and need to be operated again.
Four, air compressor sign-off
After adjusting the air compressor according to the user and commissioning the air compressor to complete the customer's production needs, sign to confirm the acceptance, and visit the door for spot inspection and maintenance according to the planned fixed time cycle.